Dallas Construction & Roofing Company

Featured Commercial Projects

  • Kaufman High School

    $1.6MM project which consisted of 130,000 sq. ft. of TPO membrane and 45,000 sq. ft. tapered and curved standing seam metal roof panels.

  • Westlake Fire Station

    $650k project consisting of 50,000 sq. ft. of a 2 piece clay tile roof system and a 5000 sq. ft. fully tapered TPO roof system.

  • Peach Elementary School

    $1.56MM project which consisted of 88,000 sq. ft. of 4-ply built-up asphalt roofing and 25,000 sq. ft. of aluminum composite wall panels.

  • The Epic Waterpark & Recreation Center

    $1.26MM project which consisted of 110,000 sq. ft. of fully adhered TPO membrane on full tapered curbed roof slopes.

  • Sam Houston High School

    $2.273MM project which consisted of 160,000 sq. ft. of 4-ply built -up asphalt roofing and 95,000 sq. ft. of metal wall panels.

  • Bass Pro Shops

    80,000 sq. ft. roof replacement of shingle roofing completed safely during business operations.

  • Golden Triangle Mall

    $2MM dollar project consisted of 300,000 sq. ft. roof replacement of a modified bitumen roof system over an active shopping mall.

  • Our Redeemer Lutheran Church

    $750k project replacing 110,000 sq. ft. of 80mil TPO and 45,000 sq. ft. of curved and tapered standing seam metal roof panels — Winner of the 2013 NTRCA Golden Hammer Award for most outstanding commercial roofing project in North Texas.

  • Lady Bird Johnson Middle School

    $1.4MM project on the first net zero school project in Texas featured Metal Architecture magazine. Project included 140,000 sq. ft. of TPO roofing and 55,000 sq. ft. of architectural wall panels.

  • Libby Maus Middle School

    $1.264MM project 140,000 sq. ft. of modified bitumen roofing and 90,000 sq. ft. of standing seam metal roof panels.

  • Tom Thumb

    $850k project that consisted of a full replacement of a built up asphalt roof with pea gravel while the business remained opened. The 120,000 sq. ft. new roof consisted of 6 inches of roof insulation and a fully adhered TPO roof system.

  • McKinney High School

    $2.8MM dollar project over two phases including the most recent addition which included 400,000 sq. ft. of modified bitumen roofing.

  • Frisco ISD Career and Technology Center

    $1.45MM project with 120,000 sq. ft. of modified bitumen roofing and 45,000 sq. ft. of standing seam metal roof panels.